We use Reference Operation Sets to build material routes. In the ROS we allocate BOM components to the operation. When we create a new ROS it is often done by copying an existing ROS. When we do this all the allocations are copied as well. Does anybody know of a way to control (block) the copying of the allocations?
Regards,
Linda