Hi Experts,
The same RM is being used in 3 different FGs but the RM is being kept at 3 different storage locations and are not allowed to get mixed with each other i.e. the storage locations are based on the different FGs mnufactured. During MRP run the user wants that according to each different FG requirement the system should plan RM requirement based on that particular storage location only. Please suggest solutions.
Regards
Sm.