excess production is plannying by heuristics

$
0
0

Hi all,

 

We are facing a weired problem.

 

Heuristics is planning for excess production.

 

1. Total demand is 1300

2. Production planned in same bucket is 1310.

3. Production plan in the last bucket of the horizon is 10 units reduced.( total demand is 1200 and production planned is 1190).

4.Initial buckets demand is zero.

 

Below master data settings are checked.

 

1.Lot for Lot strategy.

2.Saftey stock days is zero and value is zero.

3. Scrap percentage in PDS is not maintained.

4. Rounding value is 10.

 

Request for your inputs and solution as we are unable to plan for monthly cycle.

 

Regards

Bans.