Hello,
I have the following scenario:
- in a given operation in the recipes, we have two secondary recourses assigned to two different resources by default
- these default different resources have different capacity categories (say 001 and Z01);
- in CM25 my pool correctly shows I have capacity requirements for 001 and for Z01;
- besides the default resources, I have other alternative resources (others for category 001, and others for category Z01)
It should only be possible to dispatch capacity requirements 001 to resources with capacity category 001, and capacity requirements Z01 to resources with capacity category Z01. However, CM25 lets me drag and drop requirements of 001 to Z01 resources, and vice versa.
(I could filter and work separately with 001 and Z01, but I need to see both at the same time in the planning table so that taken capacity is used when finite scheduling)
It is possible to configure that capacity category should be considered when using drag and drop?
Hope I was clear enough, it is not so easy to explain.
Thank you !