Hello All,
We don't want to use additive costs for upliftment of our standards for freight, duty & handling charges.
I was trying to achieve this via a overhead costing sheet and I have done the following steps,
1) Define Condition table - which includes material number
2) Define Dependencies -
3) Assign the Overhead Rates
4) Assigned the overhead key in material master in costing 1 view
When I running CK11N, I'm expecting to calculate overhead based on the % give in the KZZ2.
The system is not calculating overhead. Any ideas please.
Thanks,
Srini